Cotton Patch health inspection
1925 N Central Expy, Mckinney, TX 75070
A92
DineScores grade A (90-100), a blend of the last 3 inspections. Latest inspection Aug 24, 2026 by McKinney Health Inspections.
Violations at the latest inspection
- Handwashing facilities adequate, accessible and supplied: Observed knife stored in front hand sink. Remove. Hand sinks are for handwashing only.
- Utensils, equipment and linens properly used, stored and handled: Observed torn gasket in breading prep cooler. Replace the gasket.
- Food and non-food contact surfaces cleanable, properly designed and used: Observed no seal on multiple hand sinks. Reseal sink to wall. Repeat Violation. | Observed soiled seal on 3 compartment sink.
- Physical facilities installed, maintained and clean: Observed an accumulation of debris on the floor under equipment. Clean the floors. | Observed chipped tiles by back exit door. Replace tiles. | Obs
Inspection history
| Date | Score | Type | Result |
|---|---|---|---|
| Aug 24, 2026 | 94 | Routine | 6 demerits (Approved) report |
| Feb 16, 2026 | 90 | Routine | 10 demerits (Approved) report |
| Aug 13, 2025 | 86 | Routine | 14 demerits (Approved) report |
| Feb 24, 2025 | 91 | Routine | 9 demerits (Approved) report |
| Jun 20, 2024 | 92 | Routine | 8 demerits (Approved) report |
| Feb 20, 2024 | 100 | Routine | 0 demerits (Approved) report |
| Oct 4, 2023 | 95 | Routine | 5 demerits (Approved) report |
| Jun 23, 2023 | 94 | Routine | 6 demerits (Approved) report |
| Feb 15, 2023 | 89 | Routine | 11 demerits (Approved) report |
| Oct 28, 2022 | 96 | Routine | 4 demerits (Approved) report |
| Aug 9, 2022 | 84 | Routine | 16 demerits (Approved) report |
| Jan 25, 2022 | 66 | Routine | 34 demerits (Approved) report |
| Sep 9, 2021 | 96 | Routine | 4 demerits (Approved) report |
| Jan 25, 2021 | 97 | Routine | 3 demerits (Approved) report |
| Jul 30, 2020 | 92 | Routine | 8 demerits (Approved) report |
| Apr 15, 2020 | 98 | Routine | 2 demerits (Approved) report |
| Jul 12, 2019 | 93 | Routine | 7 demerits (Approved) report |
| Mar 27, 2019 | 100 | Routine | 0 demerits (Approved) report |
| Nov 21, 2018 | 83 | Routine | 17 demerits (Approved) report |
| Sep 21, 2018 | 98 | Routine | 2 demerits (Approved) report |